torstai 7. helmikuuta 2008

Third & fourth day

I was travelling on wednesday so now two days at one time. When getting higher more time is wasted to prepare stands for installation. on third day there was need to set second level on stands and then some layers of logs and today more stands. Now we planned to install intermediate roof/floor supports. This seems to be good idea becasuse they have to be installed anyway.

17 layers are now installed and still 17 to go. Gable wall triangles are anyway short stubs and thou easier and faster to install.

Now the shape is well visible. Front wall will be build from very tiny stubs whichs are collected to the porch. Lower holes for railing is already visible on upmost layer.

Wheather has beed warm which is not very good for log building because logs get easily little wet. Also snow on the ground is very slippery.