maanantai 18. helmikuuta 2008

Third week

Work is ongoing. Supports for the brick roof and plastic base roof is installed. Coloured panels are installed at the edge of the roof as well as below the eaves. Now we move inside the

The visual progres of the building will be minor from now on so I also reduce the frequency of this blog. Following major steps in near future will be insulation, inner roofs, floors, electricity, doors & windows and bricks to the roof. then there will also be painting that has to be done during the later spring. But one thing at the time.