Now these professionals (järviseudun viherrakennus) have worked for couple weeks and most difficult part is almost done. Some stones still missing beside the walls but major stone layers are done and asphalt (that later will be red) couple weeks ago. During this time we also installed new waste water treatment system (Ecolator 10) that will replace the old treatment system. Replacement is good to do in this point when yard is rolled up and refomed. New system is now running and seems to be fine.

Next step will be reforming the shape of the yard at the front of the house and setting up the stone wall and walkway to barbecue house. Watersystem and plants are still waiting to their place on the yard.
The new building (double log garner) is almost ready. Only some electrical and data cable connections are still missing. That should not be a big issue after we get the right components on place. It has been fairly busy time with these tiny exersises hopefully I have more time for updates nexth months.