10 weeks is now gone when we started to build the double garner on the yard. There has been fairly long period that I have't update this issue in the blog because the outside of the building has not changed alot during this time. Anyway now we had some nice spring days and we managed to build the brick roof was insalled about
2 weeks ago. windows and doors are also installed with all the decorations around them. So outside view is now as it will be only stairs and paint is missing. Stairs will be there when we had time to build them and painting takes place when weather is warm enough to do it.
Interior is also proceeding well. Right after the internal roof supports and protective papers were intslled the insulation was done by blowing the "paper wool" on the place. Ongoing task is the floor installation. Floor material is ready maid pine panels which is fixed by screws on the supports. About half of the floors is now installed one room downstairs and half of the top floor.
Installation of heating systems is also started. First of the tree systems is now up and running and it gives nice heat to one room in downstairs. Hopefully next week we also get rest two units installed and so the complete heating on. These outside units need to be hided somehow and that is problem that I have to resolve. OK but that is something I like (solving this kind of problems ;) ), unfortunately it takes some time to figure out suitable solution. Hopfully external pressure is not setting too much pressure to my process.
Ei kommentteja:
Lähetä kommentti